The Department of Public Services has solved the problem of accumulation of rainwater in Pozo Aledo, in the section from the Church to the civic center, prior to the construction of a sidewalk to facilitate pedestrian access between.
The works involved the installation of gutters and drainage through pipes, for what has taken other existing rainwater that collected in the church square.
Utilities Councilman Jose Miguel Luengo explained that the works have been performed in accordance with the Highways Agency, have affected the F-48 and F-28, (side of the church and road Avileses) solved the problem of water accumulation on the roadway.
The roof drainage has been the first step to the works of "Curb F48 sidewalks on the road from the church square at Pozo Aledo Civic Center", to be included among the upcoming municipal investments, which consist of construction of a sidewalk than 230 meters long and 2 meters wide, with lighting, on the left side of the road.
Source: Ayuntamiento de San Javier